Artık Düşler

FROM OUTSIDE THE FENCE · FROM THE STREET

The main market building, covered in graffiti with a collapsed roof, and dry reeds in front

22.11.2026 · PHOTO: EZGİ ÇATORİ

22.11.2026 · FROM INSIDE THE SITE

A two-storey yellow building with empty windows and an outside staircase in the middle; a crane and the gasometer behind
Ruined Mercati Generali buildings and apartment blocks beyond an empty, reed-covered lot under a cloudy skyThe gasometer, a crane, empty yellow-fronted market buildings and reeds in front, under a cloudy skyWide view of the Mercati Generali site: the gasometer and a crane on the left, ruined buildings in the middle, a green fence and reeds in frontA half-ruined yellow market building, a wooden water tower and a tall red-brick apartment block behindA well-kept cream building next to a ruined yellow one, the gasometer and a crane behindA green strip running between the reeds, ruined buildings on both sides and apartment blocks behind

INSTALLATION IDEA · THREE LAYERS

  1. The years the market was alive
    Porters, sellers and morning haggling from the 1920s on. Archive photos.
  2. Emptiness and objection
    Closure, fences, graffiti, the voice of the neighbourhood.
  3. A living place
    The photos return to their own places inside the buildings.
Satellite view of the Mercati Generali site: courtyards and long warehouse buildings

SITE · VIA OSTIENSE / VIA FRANCESCO NEGRI

RESEARCH BOARD · 2.5.2024↔
Research board with street views, satellite maps, archive photos and source links side by side

LATEST · 17.11.2026

Who will decide the site’s future?

The city is opening the old market to a privately funded project of student housing, a square and services. The neighbourhood wants a park that keeps the existing green and public use of the historic buildings.

THE CITY’S PLAN

  • Land owned by Roma Capitale; ~€380 million private investment managed by Hines
  • 60-year concession
  • 2,000+ student beds, ~500 at controlled rent
  • Library, media library, squares, green space
  • Construction 2027, ~36 months

THE NEIGHBOURHOOD’S PROPOSAL

  • A large public park
  • Protect the spontaneous vegetation and the wetland
  • The historic market halls for culture, art and neighbourhood life
  • Reopen the key decisions

OBJECTIONS

  1. Long concession, expensive beds: according to the committee, the 60-year concession puts the investor’s priorities first; cultural and social spaces shrank with project changes.
  2. Loss of green: the committee says the wetland and young trees were destroyed during preparatory works.
  3. Participation after the decision: according to the committee and Italia Nostra Roma, the meetings came after the key decisions, so they cannot change the project.

TIMELINE

  1. 10.11.2025
    The city signed the supplementary agreement; meetings with the neighbourhood came only after.
  2. 28.02.2026
    Hundreds marched through Ostiense and Garbatella.
  3. APRIL 2026
    The neighbourhood committee sent the city a formal notice.
  4. 22.07.2026
    The Municipio VIII council chamber was symbolically occupied in protest at the approval process.
  5. OCTOBER 2026
    The issue resurfaced in protests against international real-estate investment in Rome.
  6. 17.11.2026
    No announcement that the project has been cancelled or the concession withdrawn. Construction is planned to start in 2027.

SOURCES: ROMA CAPITALE (COMUNE.ROMA.IT), CORRIERE DELLA SERA ROMA, RADIO ONDA ROSSA · RESEARCH OF 17.11.2026

SOURCES

Sovrintendenza Roma · document (PDF) ↗Sovrintendenza Roma · document 2 (PDF) ↗Lost Italy · I Mercati Generali di via Ostiense ↗Inpress Magazine · Il fantasma dei Mercati Generali ↗Album di Roma · Addio Mercati Generali ↗Pigeon Eyes · archive photo ↗

THIS IDEA IS YOURS TOO · CC BY

Use

Take the idea: try it in another abandoned building. The research sources are on the page.

I’m using this idea →Write in the margin ✎

WITH YOUR NAME OR ANONYMOUS · VISIBLE AFTER APPROVAL

PEOPLE USING IT · 0

EMPTY FOR NOW

MARGIN NOTES · 0

Notes appear here, as if written in the margin of the page.

IMAGE OR FILE
AS WHO

Only to let you know when your contribution is approved. It never appears on the site.

WITH YOUR NAME OR ANONYMOUS · VISIBLE AFTER APPROVAL